Intrinsic Foundries

Reactors

One reactor family, 5 L to 3 kL.

Horizontal tubular photobioreactors in modified PMMA on aluminium frames, joined with aseptic same material flanges. The same geometry runs from the strain bank to a commercial train, so a result at 25 L means something at a commercial train.

Same geometry

Strain bank to commercial

Aseptic flanges

Same material joints

Made on site

Tube extruded at the plant

Modular

Trains added stepwise

The family

Seven sizes, one geometry.

Strain bank5 L

Strain maintenance and screening

Nominal volume5 L
Inoculum10 L

Seed culture for the next stage up

Nominal volume10 L
Lab25 L

Condition trials and strain selection

Nominal volume25 L
Lab100 L

Process development, deployed with research partners

Nominal volume100 L
Lab350 L

Pre pilot runs and induction studies

Nominal volume350 L
Pilot1 kL

Site validation on real industrial gas

Nominal volume1,000 L
Commercial3 kL

First commercial train at a host site

Nominal volume3,000 L

Operating volume is set per size at commissioning. Detailed specifications are shared under NDA.

Above 3 kL

Custom built to the site.

Seven sizes up to 3 kL are predefined and quoted from the catalogue. Larger plants are engineered per site: train count, layout, gas handling and utilities are set with your team, then built as modules on the same geometry.

Configure

Build your reactor.

Pick a size, a carbon source and the options your site needs. Numbers update as you choose.

01 / Reactor size

02 / Number of trains

03 / Carbon source

04 / Siting

05 / Target product family

06 / Water source

07 / Power availability

08 / Options

Your configuration

Pilot, 1 kL

1 train · Industrial flue gas · Co-located at an emitter · C series lipids

Working volume1,000 L
Indicative footprint42 sq m

Preconditioning section sized for dust and temperature. Footprint is indicative until we lay the trains out on your site plan. Output and process figures are shared under NDA once we know your gas.

Made where it runs

Tube is extruded and pipe fabricated on site, so nothing finished is freighted and lead times collapse.

See the build

Rental before CAPEX

Most sites start on a rented train and convert later, so the first cycle is not a capital decision.

Ask about terms

Monitored from day one

Every train ships with PLC control and Intrinsic Pulse telemetry, so the culture is visible from the first fill.

See Pulse